RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014901 - Archived data from Tue, 11. August 2020 17:40:41 CEST


This is all the information about APD 1318014901. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014901
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 412.3 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 348
Position in grid: 3
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.5216675 V     T = -25 °C: 375.951065 V
Voltage for Gain 150: T = +20 °C: 420.4601188 V     T = -25 °C: 383.7770143 V
Voltage for Gain 200: T = +20 °C: 424.8518045 V     T = -25 °C: 388.1271136 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.370805523 V-1     T = -25 °C: 4.634300699 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.483135331 V-1     T = -25 °C: 9.172319223 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.64123758 V-1     T = -25 °C: 14.34679937 V-1
Break-through voltage: T = +20 °C: 439.7039215 V     T = -25 °C: 403.5351815 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:58 CET jreher Updated box and position via API.
07. Oct 2020 15:44:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:12 CET jreher Updated APD location via API.
25. Nov 2019 17:31:37 CET jreher Updated box and position via API.
22. Oct 2019 14:33:20 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:18 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:27:27 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:56 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:58 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:20 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:56 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:48 CEST Tobias Imported from Hamamatsu datasheet.