RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014898 - Archived data from Wed, 07. October 2020 15:44:57 CEST


This is all the information about APD 1318014898. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014898
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 417.7 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 348
Position in grid: 0
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.050417 V     T = -25 °C: 381.4897598 V
Voltage for Gain 150: T = +20 °C: 425.9866785 V     T = -25 °C: 389.3462843 V
Voltage for Gain 200: T = +20 °C: 430.3941311 V     T = -25 °C: 393.708578 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541519123 V-1     T = -25 °C: 4.440459677 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.94769269 V-1     T = -25 °C: 8.708547175 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88427377 V-1     T = -25 °C: 15.2232081 V-1
Break-through voltage: T = +20 °C: 440.0107325 V     T = -25 °C: 409.6979722 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:58 CET jreher Updated box and position via API.
07. Oct 2020 15:44:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:12 CET jreher Updated APD location via API.
25. Nov 2019 17:31:37 CET jreher Updated box and position via API.
22. Oct 2019 14:33:20 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:18 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:27:27 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:56 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:58 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:20 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:56 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:48 CEST Tobias Imported from Hamamatsu datasheet.