RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014890


This is all the information about APD 1318014890. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014890
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.7 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 341
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: 10516
   
Shipment:  
Grid number: 347
Position in grid: 12
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.3270075 V     T = -25 °C: 378.6559666 V
Voltage for Gain 150: T = +20 °C: 423.2392205 V     T = -25 °C: 386.48417 V
Voltage for Gain 200: T = +20 °C: 427.6229902 V     T = -25 °C: 390.8209635 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450043837 V-1     T = -25 °C: 4.331650545 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.674830035 V-1     T = -25 °C: 8.583330155 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0972739 V-1     T = -25 °C: 14.81248609 V-1
Break-through voltage: T = +20 °C: 439.9577724 V     T = -25 °C: 406.2006011 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 21:59:31 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:31:59 CET jreher Updated box and position via API.
07. Oct 2020 15:45:45 CEST jreher Updated APD location via API.
17. Aug 2020 14:53:03 CEST vwerner Updated APD batch assignment via API.
11. Aug 2020 17:54:03 CEST jreher Updated APD location via API.
27. Oct 2017 10:23:25 CEST Tobias Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated.
29. Sep 2017 12:24:04 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:56 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:48 CEST Tobias Imported from Hamamatsu datasheet.