RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014856


This is all the information about APD 1318014856. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014856
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 419.3 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 410
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: 10643
   
Shipment:  
Grid number: 346
Position in grid: 0
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 03. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 419.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.2520218 V     T = -25 °C: 383.6785462 V
Voltage for Gain 150: T = +20 °C: 428.1468614 V     T = -25 °C: 391.4917068 V
Voltage for Gain 200: T = +20 °C: 432.5365428 V     T = -25 °C: 395.8342069 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.491574697 V-1     T = -25 °C: 4.734544817 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.780935768 V-1     T = -25 °C: 8.541912819 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22781829 V-1     T = -25 °C: 14.77539318 V-1
Break-through voltage: T = +20 °C: 439.922078 V     T = -25 °C: 411.4347138 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 22:08:33 CEST jreher Updated APD characteristics via API.
31. Mar 2021 14:14:14 CEST jreher Updated box and position via API.
08. Feb 2021 11:12:52 CET jreher Updated APD location via API.
05. Feb 2021 17:07:13 CET jreher Updated APD batch assignment via API.
03. Feb 2021 18:07:12 CET jreher Updated APD location via API.
03. Nov 2017 16:15:10 CET markus.moritz Entered shipped after irradiation date.
03. Nov 2017 16:14:19 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:18:50 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:55 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:47 CEST Tobias Imported from Hamamatsu datasheet.