RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1318014848 - Archived data from Wed, 05. October 2016 15:42:51 CEST


This is all the information about APD 1318014848. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1318014848
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 411.6 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 345
Position in grid: 12
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 90 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:09:29 CEST jreher Updated APD location via API.
02. Nov 2016 14:38:26 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:56 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:51 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:44 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:02:40 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:10:33 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:47 CEST Tobias Imported from Hamamatsu datasheet.