RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1317014823 - Archived data from Thu, 08. October 2020 18:16:07 CEST


This is all the information about APD 1317014823. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1317014823
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 433 V
Voltage for Gain 100 (T=+25°C): 404.3 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 360
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 344
Position in grid: 14
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:01:34 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:26 CET jreher Updated box and position via API.
08. Oct 2020 18:16:07 CEST jreher Updated APD location via API.
08. Sep 2020 16:49:05 CEST vwerner Updated APD batch assignment via API.
20. Dec 2016 10:29:25 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:50 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:48 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:06 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:47 CEST Tobias Imported from Hamamatsu datasheet.