RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1317014821 - Archived data from Wed, 07. October 2020 15:44:57 CEST


This is all the information about APD 1317014821. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1317014821
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.9 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 344
Position in grid: 12
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.3830454 V     T = -25 °C: 379.7333387 V
Voltage for Gain 150: T = +20 °C: 424.2809537 V     T = -25 °C: 387.561515 V
Voltage for Gain 200: T = +20 °C: 428.6607529 V     T = -25 °C: 391.8901546 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437770699 V-1     T = -25 °C: 4.709695723 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.691091014 V-1     T = -25 °C: 8.555714221 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17248193 V-1     T = -25 °C: 14.84035711 V-1
Break-through voltage: T = +20 °C: 439.994592 V     T = -25 °C: 407.8005726 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:57 CET jreher Updated box and position via API.
07. Oct 2020 15:44:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:39 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:00 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:11 CET jreher Updated APD location via API.
25. Nov 2019 17:31:37 CET jreher Updated box and position via API.
22. Oct 2019 14:33:19 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:17 CEST jgrochowski Updated APD batch assignment via API.
20. Dec 2016 10:29:25 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:50 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:48 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:06 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:47 CEST Tobias Imported from Hamamatsu datasheet.