RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1317014816 - Archived data from Wed, 07. October 2020 15:44:56 CEST


This is all the information about APD 1317014816. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1317014816
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 411.9 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 344
Position in grid: 7
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 20. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.8551173 V     T = -25 °C: 375.0985383 V
Voltage for Gain 150: T = +20 °C: 419.816101 V     T = -25 °C: 383.0637975 V
Voltage for Gain 200: T = +20 °C: 424.2275134 V     T = -25 °C: 387.4918675 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.591936128 V-1     T = -25 °C: 4.5285062 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.042450824 V-1     T = -25 °C: 8.743566812 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95358716 V-1     T = -25 °C: 15.26230951 V-1
Break-through voltage: T = +20 °C: 438.3210143 V     T = -25 °C: 402.7755676 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:57 CET jreher Updated box and position via API.
07. Oct 2020 15:44:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:00 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:11 CET jreher Updated APD location via API.
25. Nov 2019 17:31:36 CET jreher Updated box and position via API.
22. Oct 2019 14:33:19 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:40 CEST jgrochowski Updated APD batch assignment via API.
20. Dec 2016 10:29:25 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:50 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:48 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:06 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:54 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:46 CEST Tobias Imported from Hamamatsu datasheet.