RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014651 - Archived data from Wed, 07. October 2020 15:44:56 CEST


This is all the information about APD 1315014651. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014651
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 412.4 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 292
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 337
Position in grid: 15
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.9400604 V     T = -25 °C: 376.3719737 V
Voltage for Gain 150: T = +20 °C: 420.8481309 V     T = -25 °C: 384.1891298 V
Voltage for Gain 200: T = +20 °C: 425.2393802 V     T = -25 °C: 388.5260571 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570173796 V-1     T = -25 °C: 4.471807415 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.054162366 V-1     T = -25 °C: 8.864495457 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01139812 V-1     T = -25 °C: 15.53178677 V-1
Break-through voltage: T = +20 °C: 438.4073948 V     T = -25 °C: 404.3382149 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:56 CET jreher Updated box and position via API.
07. Oct 2020 15:44:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:00 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:10 CET jreher Updated APD location via API.
25. Nov 2019 17:31:36 CET jreher Updated box and position via API.
22. Oct 2019 14:33:18 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:39 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:48 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:08 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:16:10 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:05:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:45 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:43 CEST Tobias Imported from Hamamatsu datasheet.