RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014643 - Archived data from Tue, 11. August 2020 17:40:36 CEST


This is all the information about APD 1315014643. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014643
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 436 V
Voltage for Gain 100 (T=+25°C): 408.2 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 337
Position in grid: 7
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 408.3192735 V     T = -25 °C: 371.6375759 V
Voltage for Gain 150: T = +20 °C: 416.2939472 V     T = -25 °C: 379.5065791 V
Voltage for Gain 200: T = +20 °C: 420.7129358 V     T = -25 °C: 383.8610625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410536115 V-1     T = -25 °C: 4.370010022 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.566896012 V-1     T = -25 °C: 8.524559668 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83081471 V-1     T = -25 °C: 14.77127758 V-1
Break-through voltage: T = +20 °C: 433.8533317 V     T = -25 °C: 399.3695311 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:54 CET jreher Updated box and position via API.
07. Oct 2020 15:44:55 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:54 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:03 CET jreher Updated APD location via API.
25. Nov 2019 17:31:35 CET jreher Updated box and position via API.
22. Oct 2019 14:32:47 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:39 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:48 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:08 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:16:10 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:05:42 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:44 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:43 CEST Tobias Imported from Hamamatsu datasheet.