RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014631 - Archived data from Wed, 07. October 2020 15:44:49 CEST


This is all the information about APD 1315014631. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014631
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H10
Break-through voltage: 438 V
Voltage for Gain 100 (T=+25°C): 410.6 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 336
Position in grid: 16
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.8596182 V     T = -25 °C: 375.011587 V
Voltage for Gain 150: T = +20 °C: 419.7998225 V     T = -25 °C: 382.9190897 V
Voltage for Gain 200: T = +20 °C: 424.2077602 V     T = -25 °C: 387.3147837 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.574363333 V-1     T = -25 °C: 4.564718051 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.071226303 V-1     T = -25 °C: 8.996127407 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05341703 V-1     T = -25 °C: 13.94294014 V-1
Break-through voltage: T = +20 °C: 437.4145886 V     T = -25 °C: 401.5997538 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:36 CET jreher Updated box and position via API.
07. Oct 2020 15:44:49 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:32 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:40 CET jreher Updated APD location via API.
25. Nov 2019 17:31:24 CET jreher Updated box and position via API.
22. Oct 2019 14:31:15 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:23 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:29:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:05:25 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:42 CEST Tobias Imported from Hamamatsu datasheet.