RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014627 - Archived data from Wed, 07. October 2020 15:44:42 CEST


This is all the information about APD 1315014627. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014627
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 406.9 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 288
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 336
Position in grid: 12
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 407.3599546 V     T = -25 °C: 370.6312062 V
Voltage for Gain 150: T = +20 °C: 415.2616089 V     T = -25 °C: 378.4424316 V
Voltage for Gain 200: T = +20 °C: 419.6378801 V     T = -25 °C: 382.7716431 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466448991 V-1     T = -25 °C: 4.431840216 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.724947891 V-1     T = -25 °C: 8.669383438 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19362207 V-1     T = -25 °C: 15.12458775 V-1
Break-through voltage: T = +20 °C: 431.3370946 V     T = -25 °C: 398.51859 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:25 CET jreher Updated box and position via API.
07. Oct 2020 15:44:42 CEST jreher Updated APD location via API.
11. Aug 2020 17:39:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:27 CET jreher Updated APD location via API.
25. Nov 2019 17:31:17 CET jreher Updated box and position via API.
22. Oct 2019 14:30:37 CEST spankonin Updated APD location via API.
09. Oct 2019 11:26:59 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:29:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:05:25 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:42 CEST Tobias Imported from Hamamatsu datasheet.