RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014621 - Archived data from Tue, 11. August 2020 17:39:57 CEST


This is all the information about APD 1315014621. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014621
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 411 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 288
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 336
Position in grid: 6
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 22. Feb 2018
Dose used: 30 Gy
Temperature: 25 °C
Position: 4
Bias voltage: 0 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.5552179 V     T = -25 °C: 374.9616259 V
Voltage for Gain 150: T = +20 °C: 419.4977625 V     T = -25 °C: 382.7848398 V
Voltage for Gain 200: T = +20 °C: 423.8897906 V     T = -25 °C: 387.1186945 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.364713122 V-1     T = -25 °C: 4.611540131 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.497291161 V-1     T = -25 °C: 9.248215898 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68257057 V-1     T = -25 °C: 14.4509007 V-1
Break-through voltage: T = +20 °C: 439.1865475 V     T = -25 °C: 402.6037621 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:25 CET jreher Updated box and position via API.
07. Oct 2020 15:44:42 CEST jreher Updated APD location via API.
11. Aug 2020 17:39:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:18 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:26 CET jreher Updated APD location via API.
25. Nov 2019 17:31:17 CET jreher Updated box and position via API.
22. Oct 2019 14:30:37 CEST spankonin Updated APD location via API.
09. Oct 2019 11:26:58 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 12:29:13 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:05:25 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:42 CEST Tobias Imported from Hamamatsu datasheet.