RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0914010027 - Archived data from Thu, 23. June 2016 10:26:43 CEST


This is all the information about APD 0914010027. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0914010027
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 2.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:08:30 CEST jreher Updated APD location via API.
12. Sep 2016 09:52:23 CEST markus.moritz Entered return for assembly date.
04. Aug 2016 12:49:27 CEST markus.moritz Entered arrival for irradiation date.
04. Aug 2016 12:48:57 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 16:29:43 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:14:11 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 16:14:00 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 16:32:36 CEST markus.moritz Entered irradiation information.
02. Aug 2016 15:19:19 CEST christopher.l.hahn Entered annealing information.
01. Aug 2016 17:27:43 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:26:43 CEST Tobias Imported from Hamamatsu datasheet.