Show Hamamatsu Avalanche Photo Diode 1314014591 - Archived data from Fri, 05. February 2021 11:30:12 CET
This is all the information about APD 1314014591. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1314014591 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | In transit to Mainz |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G11 |
Break-through voltage: | 449 V |
Voltage for Gain 100 (T=+25°C): | 419.8 V |
Dark current: | 8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 326 |
Position in Box: | 38 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 334 |
Position in grid: | 17 |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 415.6810974 V T = -25 °C: 383.4430145 V |
Voltage for Gain 150: | T = +20 °C: 424.6689673 V T = -25 °C: 391.2980471 V |
Voltage for Gain 200: | T = +20 °C: 429.7022029 V T = -25 °C: 395.6538555 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 3.877796584 V-1 T = -25 °C: 4.436529492 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.062260015 V-1 T = -25 °C: 8.701775014 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 13.08778117 V-1 T = -25 °C: 15.16376134 V-1 |
Break-through voltage: | T = +20 °C: 439.9751788 V T = -25 °C: 411.5997494 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
07. Feb 2022 16:17:24 CET | jreher | Updated APD characteristics via API. |
10. Nov 2021 14:35:21 CET | oafedulidis | Updated APD location via API. |
10. Nov 2021 14:35:07 CET | oafedulidis | Updated APD batch assignment via API. |
05. Feb 2021 11:30:12 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:45:19 CEST | jreher | Updated APD location via API. |
11. Aug 2020 18:09:25 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:46:07 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:45:57 CEST | jreher | Updated box and position via API. |
09. Jul 2020 15:02:40 CEST | jreher | Updated APD batch assignment via API. |
27. Oct 2017 10:23:25 CEST | Tobias | Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated. |
29. Sep 2017 09:53:31 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:48 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:42:38 CEST | Tobias | Imported from Hamamatsu datasheet. |