Show Hamamatsu Avalanche Photo Diode 1314014583 - Archived data from Wed, 10. November 2021 14:35:06 CET
This is all the information about APD 1314014583. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1314014583 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | In transit to Mainz |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E04 |
Break-through voltage: | 444 V |
Voltage for Gain 100 (T=+25°C): | 415.8 V |
Dark current: | 10.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 326 |
Position in Box: | 31 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 334 |
Position in grid: | 10 |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 373.0192417 V T = -25 °C: 378.8681612 V |
Voltage for Gain 150: | T = +20 °C: 389.4461989 V T = -25 °C: 386.7995528 V |
Voltage for Gain 200: | T = +20 °C: 399.3706858 V T = -25 °C: 391.2070612 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 2.395714743 V-1 T = -25 °C: 4.595568187 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 4.038076892 V-1 T = -25 °C: 9.056823933 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 6.22173123 V-1 T = -25 °C: 14.07057823 V-1 |
Break-through voltage: | T = +20 °C: 439.9798203 V T = -25 °C: 406.864196 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
07. Feb 2022 16:17:22 CET | jreher | Updated APD characteristics via API. |
10. Nov 2021 14:35:21 CET | oafedulidis | Updated APD location via API. |
10. Nov 2021 14:35:06 CET | oafedulidis | Updated APD batch assignment via API. |
05. Feb 2021 11:30:11 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:45:18 CEST | jreher | Updated APD location via API. |
11. Aug 2020 18:09:24 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:46:06 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:45:56 CEST | jreher | Updated box and position via API. |
09. Jul 2020 15:02:39 CEST | jreher | Updated APD batch assignment via API. |
27. Oct 2017 10:23:25 CEST | Tobias | Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated. |
29. Sep 2017 09:53:31 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:47 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:42:38 CEST | Tobias | Imported from Hamamatsu datasheet. |