RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1313014535 - Archived data from Tue, 11. August 2020 18:03:49 CEST


This is all the information about APD 1313014535. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1313014535
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 442 V
Voltage for Gain 100 (T=+25°C): 415 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 284
Position in Box: 9
EP1 batch: 201
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 332
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.0561048 V     T = -25 °C: 378.9374958 V
Voltage for Gain 150: T = +20 °C: 424.0280503 V     T = -25 °C: 386.9542781 V
Voltage for Gain 200: T = +20 °C: 428.4677052 V     T = -25 °C: 391.418016 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482863035 V-1     T = -25 °C: 4.569435364 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.75970839 V-1     T = -25 °C: 8.651197025 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09350894 V-1     T = -25 °C: 15.07486328 V-1
Break-through voltage: T = +20 °C: 439.9121241 V     T = -25 °C: 407.1569371 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:24:56 CET jreher Updated box and position via API.
07. Oct 2020 15:44:38 CEST jreher Updated APD location via API.
11. Aug 2020 18:03:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:37 CEST jreher Updated APD location via API.
21. Jul 2020 14:39:27 CEST jreher Updated box and position via API.
10. Feb 2020 18:58:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:10 CET jreher Updated APD location via API.
27. Nov 2019 20:17:46 CET jreher Updated APD location via API.
25. Nov 2019 17:30:59 CET jreher Updated box and position via API.
22. Oct 2019 13:09:58 CEST spankonin Updated APD location via API.
09. Oct 2019 11:37:45 CEST jgrochowski Updated APD batch assignment via API.
29. Sep 2017 11:16:01 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:46 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:37 CEST Tobias Imported from Hamamatsu datasheet.