RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1313014519 - Archived data from Tue, 11. August 2020 17:40:34 CEST


This is all the information about APD 1313014519. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1313014519
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 438 V
Voltage for Gain 100 (T=+25°C): 411.8 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 331
Position in grid: 15
Arrival for irradiation: 11. Aug 2016
Sent for analysis after irradiation: 02. Sep 2016
Return for assembly: 06. Oct 2016
   
Irradiation:  
Date: 23. Aug 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 24. Aug 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.7005712 V     T = -25 °C: 375.7109864 V
Voltage for Gain 150: T = +20 °C: 421.4946279 V     T = -25 °C: 383.6525613 V
Voltage for Gain 200: T = +20 °C: 425.8233438 V     T = -25 °C: 388.0496357 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.880383026 V-1     T = -25 °C: 4.64379464 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.260959896 V-1     T = -25 °C: 9.188675797 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 10.5633394 V-1     T = -25 °C: 14.32475665 V-1
Break-through voltage: T = +20 °C: 439.933315 V     T = -25 °C: 403.5843115 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:52 CET jreher Updated box and position via API.
07. Oct 2020 15:44:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:53 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:02 CET jreher Updated APD location via API.
25. Nov 2019 17:31:34 CET jreher Updated box and position via API.
22. Oct 2019 14:32:46 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:38 CEST jgrochowski Updated APD batch assignment via API.
06. Oct 2016 09:31:06 CEST markus.moritz Entered return for assembly date.
08. Sep 2016 13:36:00 CEST markus.moritz Entered shipped after irradiation date.
24. Aug 2016 14:40:44 CEST christopher.l.hahn Entered irradiation information.
24. Aug 2016 14:24:03 CEST christopher.l.hahn Entered annealing information.
11. Aug 2016 11:43:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:45 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:36 CEST Tobias Imported from Hamamatsu datasheet.