Show Hamamatsu Avalanche Photo Diode 1311014377 - Archived data from Fri, 07. October 2016 10:48:32 CEST
This is all the information about APD 1311014377. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1311014377 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | A07 |
Break-through voltage: | 444 V |
Voltage for Gain 100 (T=+25°C): | 415.6 V |
Dark current: | 8.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 357 |
Position in Box: | 12 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 325 |
Position in grid: | 19 |
Arrival for irradiation: | 19. Sep 2016 |
Sent for analysis after irradiation: | 30. Sep 2016 |
Return for assembly: | none |
Irradiation: | |
Date: | 27. Sep 2016 |
Dose used: | 36 Gy |
Temperature: | 20 °C |
Position: | 1 |
Bias voltage: | 350 V (connected) |
Annealing: | |
Date: | 28. Sep 2016 |
Temperature: | 80 °C |
Duration: | 10 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 14:45:21 CEST | oafedulidis | Updated box and position via API. |
16. Apr 2021 22:01:05 CEST | jreher | Updated APD characteristics via API. |
05. Feb 2021 11:34:04 CET | jreher | Updated box and position via API. |
08. Oct 2020 18:15:34 CEST | jreher | Updated APD location via API. |
17. Sep 2020 14:26:29 CEST | vwerner | Updated APD batch assignment via API. |
17. Aug 2020 14:32:03 CEST | vwerner | Updated APD batch assignment via API. |
02. Nov 2016 14:33:38 CET | markus.moritz | Entered return for assembly date. |
07. Oct 2016 10:48:32 CEST | christopher.l.hahn | Entered irradiation information. |
05. Oct 2016 15:42:30 CEST | markus.moritz | Entered shipped after irradiation date. |
28. Sep 2016 14:01:04 CEST | christopher.l.hahn | Entered annealing information. |
27. Sep 2016 18:01:51 CEST | christopher.l.hahn | Entered irradiation information. |
23. Sep 2016 09:12:27 CEST | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:41 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:42:33 CEST | Tobias | Imported from Hamamatsu datasheet. |