RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1311014377 - Archived data from Fri, 16. April 2021 22:01:05 CEST


This is all the information about APD 1311014377. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1311014377
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.6 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 325
Position in grid: 19
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: 02. Nov 2016
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 36 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.9398446 V     T = -25 °C: 379.39041 V
Voltage for Gain 150: T = +20 °C: 423.9653378 V     T = -25 °C: 387.3431852 V
Voltage for Gain 200: T = +20 °C: 428.433644 V     T = -25 °C: 391.7745726 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.517712991 V-1     T = -25 °C: 4.446405867 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.791671565 V-1     T = -25 °C: 8.597259184 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.51469725 V-1     T = -25 °C: 14.72857412 V-1
Break-through voltage: T = +20 °C: 439.8852067 V     T = -25 °C: 407.6371881 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:21 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:05 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:04 CET jreher Updated box and position via API.
08. Oct 2020 18:15:34 CEST jreher Updated APD location via API.
17. Sep 2020 14:26:29 CEST vwerner Updated APD batch assignment via API.
17. Aug 2020 14:32:03 CEST vwerner Updated APD batch assignment via API.
02. Nov 2016 14:33:38 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:32 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:30 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:04 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:01:51 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:12:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:41 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:33 CEST Tobias Imported from Hamamatsu datasheet.