RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1311014376


This is all the information about APD 1311014376. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1311014376
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 437 V
Voltage for Gain 100 (T=+25°C): 409.5 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: 10542
   
Shipment:  
Grid number: 325
Position in grid: 18
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: 02. Nov 2016
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 36 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 409.6428808 V     T = -25 °C: 373.3472423 V
Voltage for Gain 150: T = +20 °C: 417.6925527 V     T = -25 °C: 381.229513 V
Voltage for Gain 200: T = +20 °C: 422.1522097 V     T = -25 °C: 385.6206982 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.302984995 V-1     T = -25 °C: 4.440012971 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.037490381 V-1     T = -25 °C: 8.731816611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01985226 V-1     T = -25 °C: 15.23531135 V-1
Break-through voltage: T = +20 °C: 433.197269 V     T = -25 °C: 401.4705099 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
21. Apr 2021 14:45:21 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:05 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:04 CET jreher Updated box and position via API.
08. Oct 2020 18:15:34 CEST jreher Updated APD location via API.
17. Sep 2020 14:26:29 CEST vwerner Updated APD batch assignment via API.
17. Aug 2020 14:32:03 CEST vwerner Updated APD batch assignment via API.
02. Nov 2016 14:33:38 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:32 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:29 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:04 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:01:51 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:12:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:41 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:33 CEST Tobias Imported from Hamamatsu datasheet.