RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1311014375 - Archived data from Thu, 08. October 2020 18:15:34 CEST


This is all the information about APD 1311014375. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1311014375
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 436 V
Voltage for Gain 100 (T=+25°C): 407.4 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 357
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 325
Position in grid: 17
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: 02. Nov 2016
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 36 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:45:21 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:01:04 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:04 CET jreher Updated box and position via API.
08. Oct 2020 18:15:34 CEST jreher Updated APD location via API.
17. Sep 2020 14:26:28 CEST vwerner Updated APD batch assignment via API.
17. Aug 2020 14:32:03 CEST vwerner Updated APD batch assignment via API.
02. Nov 2016 14:33:38 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:32 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:29 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:04 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:01:51 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:12:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:41 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:33 CEST Tobias Imported from Hamamatsu datasheet.