RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1311014352 - Archived data from Fri, 07. October 2016 10:48:32 CEST


This is all the information about APD 1311014352. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1311014352
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 412.1 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 325
Position in grid: 2
Arrival for irradiation: 19. Sep 2016
Sent for analysis after irradiation: 30. Sep 2016
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2016
Dose used: 36 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 28. Sep 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
17. Apr 2021 01:09:29 CEST jreher Updated APD location via API.
02. Nov 2016 14:33:38 CET markus.moritz Entered return for assembly date.
07. Oct 2016 10:48:32 CEST christopher.l.hahn Entered irradiation information.
05. Oct 2016 15:42:29 CEST markus.moritz Entered shipped after irradiation date.
28. Sep 2016 14:01:03 CEST christopher.l.hahn Entered annealing information.
27. Sep 2016 18:01:51 CEST christopher.l.hahn Entered irradiation information.
23. Sep 2016 09:12:27 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:41 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:33 CEST Tobias Imported from Hamamatsu datasheet.