RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1311014326 - Archived data from Mon, 01. August 2016 17:28:40 CEST


This is all the information about APD 1311014326. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1311014326
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 412.7 V
Dark current: 10.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 523
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 323
Position in grid: 17
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 16:22:18 CET jreher Updated APD characteristics via API.
22. Nov 2021 10:56:02 CET oafedulidis Updated APD batch assignment via API.
27. Jul 2021 16:25:02 CEST oafedulidis Updated box and position via API.
20. Jul 2021 14:56:17 CEST oafedulidis Updated APD location via API.
20. Jul 2021 14:56:10 CEST oafedulidis Updated box and position via API.
19. May 2021 14:43:13 CEST jreher Updated APD location via API.
29. Sep 2017 12:02:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:40 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:32 CEST Tobias Imported from Hamamatsu datasheet.