RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1310014313 - Archived data from Fri, 29. September 2017 12:02:31 CEST


This is all the information about APD 1310014313. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1310014313
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.7 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 523
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 323
Position in grid: 8
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 16:22:16 CET jreher Updated APD characteristics via API.
22. Nov 2021 10:56:00 CET oafedulidis Updated APD batch assignment via API.
27. Jul 2021 16:25:01 CEST oafedulidis Updated box and position via API.
20. Jul 2021 14:56:16 CEST oafedulidis Updated APD location via API.
20. Jul 2021 14:56:09 CEST oafedulidis Updated box and position via API.
19. May 2021 14:43:12 CEST jreher Updated APD location via API.
29. Sep 2017 12:02:31 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:39 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:32 CEST Tobias Imported from Hamamatsu datasheet.