RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1310014292 - Archived data from Fri, 29. September 2017 14:06:58 CEST


This is all the information about APD 1310014292. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1310014292
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.6 V
Dark current: 10.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 349
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 322
Position in grid: 7
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:00:12 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:33:04 CET jreher Updated box and position via API.
17. Aug 2020 14:11:18 CEST vwerner Updated APD batch assignment via API.
11. Aug 2020 17:54:42 CEST jreher Updated APD location via API.
27. Oct 2017 10:23:25 CEST Tobias Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated.
29. Sep 2017 14:06:58 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:39 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:31 CEST Tobias Imported from Hamamatsu datasheet.