RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1310014241


This is all the information about APD 1310014241. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1310014241
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 410.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 359
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: 10550
   
Shipment:  
Grid number: 319
Position in grid: 18
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.7483681 V     T = -25 °C: 374.2837822 V
Voltage for Gain 150: T = +20 °C: 418.6808951 V     T = -25 °C: 382.0675295 V
Voltage for Gain 200: T = +20 °C: 423.0634313 V     T = -25 °C: 386.4723252 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.636053027 V-1     T = -25 °C: 4.433554033 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.159237257 V-1     T = -25 °C: 9.06743548 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33069412 V-1     T = -25 °C: 16.23024716 V-1
Break-through voltage: T = +20 °C: 438.584682 V     T = -25 °C: 401.9759072 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 22:01:33 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:24 CET jreher Updated box and position via API.
08. Oct 2020 18:16:00 CEST jreher Updated APD location via API.
08. Sep 2020 16:49:04 CEST vwerner Updated APD batch assignment via API.
09. Dec 2016 10:29:04 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:42 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:23 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:52:39 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:37 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:30 CEST Tobias Imported from Hamamatsu datasheet.