RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014235 - Archived data from Tue, 11. August 2020 17:40:33 CEST


This is all the information about APD 1309014235. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014235
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 416 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 319
Position in grid: 12
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.6504363 V     T = -25 °C: 380.393682 V
Voltage for Gain 150: T = +20 °C: 424.5153994 V     T = -25 °C: 388.1935079 V
Voltage for Gain 200: T = +20 °C: 428.8817644 V     T = -25 °C: 392.5284724 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405915212 V-1     T = -25 °C: 4.523209345 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.577618867 V-1     T = -25 °C: 8.911818324 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.23025665 V-1     T = -25 °C: 15.71539933 V-1
Break-through voltage: T = +20 °C: 433.8707544 V     T = -25 °C: 408.4141292 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:52 CET jreher Updated box and position via API.
07. Oct 2020 15:44:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:52 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:01 CET jreher Updated APD location via API.
25. Nov 2019 17:31:33 CET jreher Updated box and position via API.
22. Oct 2019 14:32:46 CEST spankonin Updated APD location via API.
15. Oct 2019 11:01:04 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:29:04 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:42 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:23 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:52:39 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:37 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:30 CEST Tobias Imported from Hamamatsu datasheet.