RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014204 - Archived data from Wed, 07. October 2020 15:44:52 CEST


This is all the information about APD 1309014204. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014204
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 439 V
Voltage for Gain 100 (T=+25°C): 410.4 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 318
Position in grid: 3
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 410.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.9442408 V     T = -25 °C: 374.1704663 V
Voltage for Gain 150: T = +20 °C: 418.8970961 V     T = -25 °C: 382.0261335 V
Voltage for Gain 200: T = +20 °C: 423.3210232 V     T = -25 °C: 386.4003798 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.552043082 V-1     T = -25 °C: 4.554086054 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.919714525 V-1     T = -25 °C: 8.921434961 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83521801 V-1     T = -25 °C: 13.86633936 V-1
Break-through voltage: T = +20 °C: 438.525809 V     T = -25 °C: 401.754751 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:49 CET jreher Updated box and position via API.
07. Oct 2020 15:44:52 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:29 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:00 CET jreher Updated APD location via API.
25. Nov 2019 17:31:32 CET jreher Updated box and position via API.
22. Oct 2019 14:32:45 CEST spankonin Updated APD location via API.
15. Oct 2019 11:01:03 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:26 CET markus.moritz Entered return for assembly date.
23. Nov 2016 13:24:00 CET markus.moritz Entered shipped after irradiation date.
23. Nov 2016 13:23:07 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:49 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:36 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:29 CEST Tobias Imported from Hamamatsu datasheet.