RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014201 - Archived data from Tue, 08. March 2022 13:54:16 CET


This is all the information about APD 1309014201. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014201
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 413.2 V
Dark current: 8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 318
Position in grid: 0
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 413.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.3282506 V     T = -25 °C: 377.7320223 V
Voltage for Gain 150: T = +20 °C: 421.3415003 V     T = -25 °C: 385.3209303 V
Voltage for Gain 200: T = +20 °C: 425.7923826 V     T = -25 °C: 389.7147283 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.407284737 V-1     T = -25 °C: 6.745410693 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.491415987 V-1     T = -25 °C: 9.998792852 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53491984 V-1     T = -25 °C: 15.51582505 V-1
Break-through voltage: T = +20 °C: 438.1541537 V     T = -25 °C: 404.6325113 V
   
Notes:


Version history

Time Author Change comment
28. Jul 2022 13:17:49 CEST oafedulidis Updated box and position via API.
28. Jul 2022 13:15:12 CEST oafedulidis Updated APD location via API.
08. Mar 2022 14:29:54 CET oafedulidis Updated APD characteristics via API.
08. Mar 2022 13:54:16 CET oafedulidis Updated APD batch assignment via API.
28. Feb 2022 15:57:50 CET oafedulidis Updated APD batch assignment via API.
24. Feb 2022 08:35:51 CET oafedulidis Updated APD location via API.
24. Feb 2022 08:35:31 CET oafedulidis Updated APD batch assignment via API.
05. Feb 2021 11:25:49 CET jreher Updated box and position via API.
07. Oct 2020 15:44:52 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:29 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:00 CET jreher Updated APD location via API.
25. Nov 2019 17:31:32 CET jreher Updated box and position via API.
22. Oct 2019 14:32:44 CEST spankonin Updated APD location via API.
15. Oct 2019 11:01:02 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:26 CET markus.moritz Entered return for assembly date.
23. Nov 2016 13:24:00 CET markus.moritz Entered shipped after irradiation date.
23. Nov 2016 13:23:07 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:49 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:36 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:29 CEST Tobias Imported from Hamamatsu datasheet.