RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014198 - Archived data from Tue, 11. August 2020 17:26:40 CEST


This is all the information about APD 1309014198. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014198
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 439.5 V
Voltage for Gain 100 (T=+25°C): 412 V
Dark current: 8.13 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 43
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 317
Position in grid: 17
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.188616 V     T = -25 °C: 375.3242648 V
Voltage for Gain 150: T = +20 °C: 420.2613251 V     T = -25 °C: 383.3141247 V
Voltage for Gain 200: T = +20 °C: 424.7560026 V     T = -25 °C: 387.7804389 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.30246751 V-1     T = -25 °C: 4.613057492 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.83422679 V-1     T = -25 °C: 8.874655642 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98375099 V-1     T = -25 °C: 14.94406555 V-1
Break-through voltage: T = +20 °C: 439.175826 V     T = -25 °C: 403.1248014 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:44 CET jreher Updated box and position via API.
03. Feb 2021 18:19:31 CET jreher Updated box and position via API.
07. Oct 2020 15:46:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:40 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:37 CET jreher Updated APD location via API.
25. Nov 2019 17:14:20 CET jreher Updated box and position via API.
04. Jul 2019 11:11:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:33 CEST jreher Updated APD batch assignment via API.
09. Dec 2016 10:26:47 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:33 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:43 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:33 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:35 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:08 CEST Tobias Imported from Hamamatsu datasheet.