RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014188 - Archived data from Tue, 11. August 2020 17:40:10 CEST


This is all the information about APD 1309014188. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014188
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 436.1 V
Voltage for Gain 100 (T=+25°C): 409.9 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 317
Position in grid: 10
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.9390319 V     T = -25 °C: 374.2847302 V
Voltage for Gain 150: T = +20 °C: 418.8864771 V     T = -25 °C: 382.1806322 V
Voltage for Gain 200: T = +20 °C: 423.3058456 V     T = -25 °C: 386.5798055 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588205093 V-1     T = -25 °C: 4.492017661 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.018895766 V-1     T = -25 °C: 8.784873924 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99566092 V-1     T = -25 °C: 15.35281418 V-1
Break-through voltage: T = +20 °C: 432.1380836 V     T = -25 °C: 401.560241 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:34 CET jreher Updated box and position via API.
07. Oct 2020 15:44:48 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:30 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:38 CET jreher Updated APD location via API.
25. Nov 2019 17:31:23 CET jreher Updated box and position via API.
22. Oct 2019 14:31:14 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:21 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:26:47 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:33 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:43 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:33 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:35 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:08 CEST Tobias Imported from Hamamatsu datasheet.