RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014184 - Archived data from Tue, 11. August 2020 17:40:08 CEST


This is all the information about APD 1309014184. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014184
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 432.6 V
Voltage for Gain 100 (T=+25°C): 407.3 V
Dark current: 7.44 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 317
Position in grid: 6
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 408.4016861 V     T = -25 °C: 371.8618998 V
Voltage for Gain 150: T = +20 °C: 416.389961 V     T = -25 °C: 379.765584 V
Voltage for Gain 200: T = +20 °C: 420.835738 V     T = -25 °C: 384.1645586 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.383283348 V-1     T = -25 °C: 4.606621231 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.545111669 V-1     T = -25 °C: 9.163700228 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94699362 V-1     T = -25 °C: 14.21227281 V-1
Break-through voltage: T = +20 °C: 425.7512525 V     T = -25 °C: 399.7970153 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:33 CET jreher Updated box and position via API.
07. Oct 2020 15:44:47 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:30 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:38 CET jreher Updated APD location via API.
25. Nov 2019 17:31:22 CET jreher Updated box and position via API.
22. Oct 2019 14:31:13 CEST spankonin Updated APD location via API.
09. Oct 2019 11:30:28 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:26:47 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:33 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:43 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:33 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:35 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:08 CEST Tobias Imported from Hamamatsu datasheet.