RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1309014178 - Archived data from Wed, 02. November 2016 14:53:33 CET


This is all the information about APD 1309014178. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1309014178
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 436.7 V
Voltage for Gain 100 (T=+25°C): 408.1 V
Dark current: 8.65 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 356
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 317
Position in grid: 1
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:00:59 CEST jreher Updated APD characteristics via API.
08. Feb 2021 12:41:13 CET jreher Updated box and position via API.
05. Feb 2021 11:33:58 CET jreher Updated box and position via API.
08. Oct 2020 18:15:24 CEST jreher Updated APD location via API.
17. Aug 2020 14:27:20 CEST vwerner Updated APD batch assignment via API.
09. Dec 2016 10:26:47 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:33 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:43 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:53:33 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:35 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:07 CEST Tobias Imported from Hamamatsu datasheet.