RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1308014147 - Archived data from Tue, 11. August 2020 17:40:24 CEST


This is all the information about APD 1308014147. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1308014147
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 431.4 V
Voltage for Gain 100 (T=+25°C): 403 V
Dark current: 5.55 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 315
Position in grid: 11
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 403.2285636 V     T = -25 °C: 366.4937526 V
Voltage for Gain 150: T = +20 °C: 411.2260382 V     T = -25 °C: 374.4104385 V
Voltage for Gain 200: T = +20 °C: 415.6623201 V     T = -25 °C: 378.793831 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.439853141 V-1     T = -25 °C: 4.389594813 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.583750325 V-1     T = -25 °C: 8.55098761 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91040952 V-1     T = -25 °C: 14.74515927 V-1
Break-through voltage: T = +20 °C: 431.3878784 V     T = -25 °C: 394.7645593 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:44 CET jreher Updated box and position via API.
11. Aug 2020 17:40:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:42 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:51 CET jreher Updated APD location via API.
25. Nov 2019 17:31:29 CET jreher Updated box and position via API.
22. Oct 2019 14:32:00 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:53 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:27:10 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:26 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:05:31 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:22 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:34 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:07 CEST Tobias Imported from Hamamatsu datasheet.