RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1308014145 - Archived data from Tue, 11. August 2020 17:40:21 CEST


This is all the information about APD 1308014145. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1308014145
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 433.5 V
Voltage for Gain 100 (T=+25°C): 405.2 V
Dark current: 5.66 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 315
Position in grid: 9
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 405.6794839 V     T = -25 °C: 368.4107099 V
Voltage for Gain 150: T = +20 °C: 413.6903885 V     T = -25 °C: 376.4367668 V
Voltage for Gain 200: T = +20 °C: 418.1399107 V     T = -25 °C: 380.9075118 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.544234268 V-1     T = -25 °C: 4.522455324 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.65902978 V-1     T = -25 °C: 8.409244802 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92982513 V-1     T = -25 °C: 13.56423829 V-1
Break-through voltage: T = +20 °C: 433.6905293 V     T = -25 °C: 397.153362 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:42 CET jreher Updated box and position via API.
11. Aug 2020 17:40:21 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:40 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:49 CET jreher Updated APD location via API.
25. Nov 2019 17:31:28 CET jreher Updated box and position via API.
22. Oct 2019 14:31:59 CEST spankonin Updated APD location via API.
14. Oct 2019 17:31:24 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:27:10 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:26 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:05:31 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:22 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:34 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:07 CEST Tobias Imported from Hamamatsu datasheet.