Show Hamamatsu Avalanche Photo Diode 1308014137 - Archived data from Tue, 11. August 2020 17:40:20 CEST
This is all the information about APD 1308014137. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1308014137 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C15 |
Break-through voltage: | 445.8 V |
Voltage for Gain 100 (T=+25°C): | 417.9 V |
Dark current: | 11.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 290 |
Position in Box: | 11 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 315 |
Position in grid: | 1 |
Arrival for irradiation: | 02. Nov 2016 |
Sent for analysis after irradiation: | 10. Nov 2016 |
Return for assembly: | 09. Dec 2016 |
Irradiation: | |
Date: | 04. Nov 2016 |
Dose used: | 30 Gy |
Temperature: | 20 °C |
Position: | 2 |
Bias voltage: | 350 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 418.0483829 V T = -25 °C: 380.4735117 V |
Voltage for Gain 150: | T = +20 °C: 426.067465 V T = -25 °C: 388.5508491 V |
Voltage for Gain 200: | T = +20 °C: 430.5225947 V T = -25 °C: 393.0517945 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.455459634 V-1 T = -25 °C: 4.478558576 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.40875327 V-1 T = -25 °C: 8.499740412 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.29461836 V-1 T = -25 °C: 13.43737731 V-1 |
Break-through voltage: | T = +20 °C: 439.8438948 V T = -25 °C: 409.1915724 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:25:41 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:40:20 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:40:40 CEST | jreher | Updated box and position via API. |
27. Nov 2019 20:18:49 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:31:27 CET | jreher | Updated box and position via API. |
22. Oct 2019 14:31:58 CEST | spankonin | Updated APD location via API. |
14. Oct 2019 17:31:23 CEST | jgrochowski | Updated APD batch assignment via API. |
09. Dec 2016 10:27:10 CET | markus.moritz | Entered return for assembly date. |
23. Nov 2016 10:53:26 CET | markus.moritz | Entered shipped after irradiation date. |
04. Nov 2016 16:05:31 CET | markus.moritz | Entered irradiation information. |
02. Nov 2016 14:51:22 CET | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:34 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:41:06 CEST | Tobias | Imported from Hamamatsu datasheet. |