Show Hamamatsu Avalanche Photo Diode 1308014134 - Archived data from Tue, 11. August 2020 17:26:39 CEST
This is all the information about APD 1308014134. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1308014134 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | F13 |
Break-through voltage: | 443.5 V |
Voltage for Gain 100 (T=+25°C): | 415.3 V |
Dark current: | 9.49 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 43 |
Position in Box: | 12 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 314 |
Position in grid: | 19 |
Arrival for irradiation: | 02. Nov 2016 |
Sent for analysis after irradiation: | 10. Nov 2016 |
Return for assembly: | none |
Irradiation: | |
Date: | 04. Nov 2016 |
Dose used: | 30 Gy |
Temperature: | 20 °C |
Position: | 2 |
Bias voltage: | 350 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 415.9456211 V T = -25 °C: 379.2816783 V |
Voltage for Gain 150: | T = +20 °C: 423.8573948 V T = -25 °C: 387.1235283 V |
Voltage for Gain 200: | T = +20 °C: 428.2366473 V T = -25 °C: 391.4946554 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.461491329 V-1 T = -25 °C: 4.38404032 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.563371259 V-1 T = -25 °C: 9.245097754 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.42344623 V-1 T = -25 °C: 14.0764207 V-1 |
Break-through voltage: | T = +20 °C: 439.630679 V T = -25 °C: 407.2975396 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:53:44 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:31 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:46:00 CEST | jreher | Updated APD location via API. |
11. Aug 2020 17:26:39 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:36:37 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:14:19 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:11:26 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:48:36 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:33:33 CEST | jreher | Updated APD batch assignment via API. |
23. Nov 2016 10:53:19 CET | markus.moritz | Entered shipped after irradiation date. |
04. Nov 2016 16:00:00 CET | markus.moritz | Entered irradiation information. |
02. Nov 2016 14:51:37 CET | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:33 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:41:06 CEST | Tobias | Imported from Hamamatsu datasheet. |