RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1308014124 - Archived data from Wed, 07. October 2020 15:46:00 CEST


This is all the information about APD 1308014124. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1308014124
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 439.1 V
Voltage for Gain 100 (T=+25°C): 411.4 V
Dark current: 9.82 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 43
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 314
Position in grid: 9
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: none
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.9240495 V     T = -25 °C: 375.2258762 V
Voltage for Gain 150: T = +20 °C: 419.8466355 V     T = -25 °C: 383.0785376 V
Voltage for Gain 200: T = +20 °C: 424.2311432 V     T = -25 °C: 387.4570956 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445809347 V-1     T = -25 °C: 4.382079734 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.483158026 V-1     T = -25 °C: 9.176250345 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25158688 V-1     T = -25 °C: 13.9333408 V-1
Break-through voltage: T = +20 °C: 437.8564589 V     T = -25 °C: 402.6122416 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:44 CET jreher Updated box and position via API.
03. Feb 2021 18:19:30 CET jreher Updated box and position via API.
07. Oct 2020 15:46:00 CEST jreher Updated APD location via API.
11. Aug 2020 17:26:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:36 CET jreher Updated APD location via API.
25. Nov 2019 17:14:19 CET jreher Updated box and position via API.
04. Jul 2019 11:11:26 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:32 CEST jreher Updated APD batch assignment via API.
23. Nov 2016 10:53:19 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:00:00 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:37 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:33 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:06 CEST Tobias Imported from Hamamatsu datasheet.