RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1308014096 - Archived data from Tue, 21. July 2020 14:40:43 CEST


This is all the information about APD 1308014096. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1308014096
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 429.6 V
Voltage for Gain 100 (T=+25°C): 402.3 V
Dark current: 4.74 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 313
Position in grid: 5
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:46 CET jreher Updated box and position via API.
11. Aug 2020 17:40:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:52 CET jreher Updated APD location via API.
25. Nov 2019 17:31:30 CET jreher Updated box and position via API.
22. Oct 2019 14:32:01 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:54 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:11 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:12 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 15:59:38 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:52:54 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:32 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:05 CEST Tobias Imported from Hamamatsu datasheet.