Serial: 1308014090
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 436 V
Voltage for Gain 100 (T=+25°C): 408.2 V
Dark current: 9.19 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 313
Position in grid: 0
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 408.9864741 V     T = -25 °C: 372.50087 V
Voltage for Gain 150: T = +20 °C: 416.9980247 V     T = -25 °C: 380.4415888 V
Voltage for Gain 200: T = +20 °C: 421.4625443 V     T = -25 °C: 384.8463786 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.530667853 V-1     T = -25 °C: 4.393315809 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.76626825 V-1     T = -25 °C: 8.478386006 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.1709882 V-1     T = -25 °C: 14.59763208 V-1
Break-through voltage: T = +20 °C: 432.1287163 V     T = -25 °C: 399.6503663 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:45 CET jreher Updated box and position via API.
11. Aug 2020 17:40:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:52 CET jreher Updated APD location via API.
25. Nov 2019 17:31:30 CET jreher Updated box and position via API.
22. Oct 2019 14:32:01 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:54 CEST jgrochowski Updated APD batch assignment via API.
09. Dec 2016 10:28:11 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:12 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 15:59:38 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:52:54 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:32 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:05 CEST Tobias Imported from Hamamatsu datasheet.