Show Hamamatsu Avalanche Photo Diode 1307014074 - Archived data from Wed, 03. February 2021 18:19:46 CET
This is all the information about APD 1307014074. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1307014074 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | In transit to Mainz |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B10 |
Break-through voltage: | 444.5 V |
Voltage for Gain 100 (T=+25°C): | 416.7 V |
Dark current: | 8.53 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 45 |
Position in Box: | 19 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 312 |
Position in grid: | 8 |
Arrival for irradiation: | 02. Nov 2016 |
Sent for analysis after irradiation: | 10. Nov 2016 |
Return for assembly: | 09. Dec 2016 |
Irradiation: | |
Date: | 04. Nov 2016 |
Dose used: | 30 Gy |
Temperature: | 20 °C |
Position: | 1 |
Bias voltage: | 350 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 417.9502936 V T = -25 °C: 381.3474034 V |
Voltage for Gain 150: | T = +20 °C: 425.9369171 V T = -25 °C: 389.2758284 V |
Voltage for Gain 200: | T = +20 °C: 430.3587805 V T = -25 °C: 393.6322654 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 3.929120744 V-1 T = -25 °C: 4.275077674 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.173543088 V-1 T = -25 °C: 9.129715269 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 16.79435686 V-1 T = -25 °C: 14.90845891 V-1 |
Break-through voltage: | T = +20 °C: 439.9906435 V T = -25 °C: 408.213415 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:53:58 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:19:46 CET | jreher | Updated box and position via API. |
07. Oct 2020 15:46:05 CEST | jreher | Updated APD location via API. |
11. Aug 2020 17:27:02 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:36:59 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:14:29 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:11:44 CEST | jreher | Updated APD location via API. |
13. Jun 2019 10:01:33 CEST | jreher | Updated APD batch assignment via API. |
09. Dec 2016 10:27:42 CET | markus.moritz | Entered return for assembly date. |
23. Nov 2016 10:53:04 CET | markus.moritz | Entered shipped after irradiation date. |
04. Nov 2016 16:01:16 CET | markus.moritz | Entered irradiation information. |
02. Nov 2016 14:51:07 CET | markus.moritz | Entered arrival for irradiation date. |
01. Aug 2016 17:28:32 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:41:05 CEST | Tobias | Imported from Hamamatsu datasheet. |