RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1307014070 - Archived data from Tue, 11. August 2020 17:27:01 CEST


This is all the information about APD 1307014070. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1307014070
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 436.5 V
Voltage for Gain 100 (T=+25°C): 411.6 V
Dark current: 11.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 45
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 312
Position in grid: 4
Arrival for irradiation: 02. Nov 2016
Sent for analysis after irradiation: 10. Nov 2016
Return for assembly: 09. Dec 2016
   
Irradiation:  
Date: 04. Nov 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 411.4673729 V     T = -25 °C: 374.8521227 V
Voltage for Gain 150: T = +20 °C: 419.3796237 V     T = -25 °C: 382.6203669 V
Voltage for Gain 200: T = +20 °C: 423.723711 V     T = -25 °C: 386.9287143 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.366927156 V-1     T = -25 °C: 4.669636223 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.46397259 V-1     T = -25 °C: 9.404525771 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56087017 V-1     T = -25 °C: 13.78517578 V-1
Break-through voltage: T = +20 °C: 435.7372725 V     T = -25 °C: 400.1563838 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:58 CET jreher Updated box and position via API.
03. Feb 2021 18:19:45 CET jreher Updated box and position via API.
07. Oct 2020 15:46:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:36:59 CET jreher Updated APD location via API.
25. Nov 2019 17:14:29 CET jreher Updated box and position via API.
04. Jul 2019 11:11:43 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:33 CEST jreher Updated APD batch assignment via API.
09. Dec 2016 10:27:42 CET markus.moritz Entered return for assembly date.
23. Nov 2016 10:53:04 CET markus.moritz Entered shipped after irradiation date.
04. Nov 2016 16:01:16 CET markus.moritz Entered irradiation information.
02. Nov 2016 14:51:07 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:32 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:05 CEST Tobias Imported from Hamamatsu datasheet.