RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1307014048


This is all the information about APD 1307014048. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1307014048
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen (mounted in Slice)
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 443.5 V
Voltage for Gain 100 (T=+25°C): 415.5 V
Dark current: 8.39 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 356
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: 10542
   
Shipment:  
Grid number: 311
Position in grid: 4
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
17. Apr 2021 01:09:48 CEST jreher Updated APD location via API.
05. Feb 2021 11:33:59 CET jreher Updated box and position via API.
08. Oct 2020 18:15:25 CEST jreher Updated APD location via API.
17. Aug 2020 14:32:01 CEST vwerner Updated APD batch assignment via API.
29. Nov 2016 11:51:42 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:30:44 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:17:32 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:05:03 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:31 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:04 CEST Tobias Imported from Hamamatsu datasheet.