RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1306013999 - Archived data from Wed, 22. June 2016 15:41:03 CEST


This is all the information about APD 1306013999. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1306013999
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 445.1 V
Voltage for Gain 100 (T=+25°C): 416.5 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:06 CET jreher Updated box and position via API.
11. Aug 2020 17:40:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:11 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:22 CET jreher Updated APD location via API.
25. Nov 2019 17:31:42 CET jreher Updated box and position via API.
11. Nov 2019 15:43:04 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:40 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:51:20 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:30:38 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:18:52 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:20 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:29 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:03 CEST Tobias Imported from Hamamatsu datasheet.