RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1306013932 - Archived data from Tue, 11. August 2020 17:40:48 CEST


This is all the information about APD 1306013932. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1306013932
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 434.3 V
Voltage for Gain 100 (T=+25°C): 407 V
Dark current: 9.84 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 304
Position in grid: 13
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 407.3847353 V     T = -25 °C: 370.4472473 V
Voltage for Gain 150: T = +20 °C: 415.2811988 V     T = -25 °C: 378.283693 V
Voltage for Gain 200: T = +20 °C: 419.6493768 V     T = -25 °C: 382.6246229 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.395315623 V-1     T = -25 °C: 4.411040452 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.551791673 V-1     T = -25 °C: 8.638128098 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.87903419 V-1     T = -25 °C: 14.95911922 V-1
Break-through voltage: T = +20 °C: 434.4712688 V     T = -25 °C: 397.8559982 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:04 CET jreher Updated box and position via API.
11. Aug 2020 17:40:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:09 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:21 CET jreher Updated APD location via API.
25. Nov 2019 17:31:40 CET jreher Updated box and position via API.
11. Nov 2019 15:43:03 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:39 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:53:34 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:21 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:52:39 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:29 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:27 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:01 CEST Tobias Imported from Hamamatsu datasheet.