RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013916 - Archived data from Tue, 11. August 2020 17:40:22 CEST


This is all the information about APD 1305013916. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013916
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 442.5 V
Voltage for Gain 100 (T=+25°C): 414.3 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 290
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 799
Position in grid: 8
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.2080629 V     T = -25 °C: 378.2257759 V
Voltage for Gain 150: T = +20 °C: 423.2074534 V     T = -25 °C: 386.1387068 V
Voltage for Gain 200: T = +20 °C: 427.6411612 V     T = -25 °C: 390.5354729 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438584214 V-1     T = -25 °C: 4.477712635 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.64304883 V-1     T = -25 °C: 8.811705827 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02044257 V-1     T = -25 °C: 15.34307709 V-1
Break-through voltage: T = +20 °C: 439.815288 V     T = -25 °C: 405.6874078 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:42 CET jreher Updated box and position via API.
11. Aug 2020 17:40:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:41 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:50 CET jreher Updated APD location via API.
25. Nov 2019 17:31:28 CET jreher Updated box and position via API.
22. Oct 2019 14:31:59 CEST spankonin Updated APD location via API.
15. Oct 2019 11:02:52 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 14:00:21 CEST jgrochowski
29. Nov 2016 11:53:34 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:21 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:52:39 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:29 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:27 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:00 CEST Tobias Imported from Hamamatsu datasheet.