RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013915 - Archived data from Wed, 07. October 2020 15:44:51 CEST


This is all the information about APD 1305013915. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013915
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 416.6 V
Dark current: 8.29 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 799
Position in grid: 9
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.1456071 V     T = -25 °C: 379.7211734 V
Voltage for Gain 150: T = +20 °C: 425.1234661 V     T = -25 °C: 387.7306211 V
Voltage for Gain 200: T = +20 °C: 429.5336688 V     T = -25 °C: 392.1668754 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422861694 V-1     T = -25 °C: 4.409020972 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.371634765 V-1     T = -25 °C: 8.3011662 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31752853 V-1     T = -25 °C: 15.21203363 V-1
Break-through voltage: T = +20 °C: 439.8301565 V     T = -25 °C: 408.5407034 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:38 CET jreher Updated box and position via API.
07. Oct 2020 15:44:51 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:33 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:41 CET jreher Updated APD location via API.
25. Nov 2019 17:31:25 CET jreher Updated box and position via API.
22. Oct 2019 14:31:16 CEST spankonin Updated APD location via API.
14. Oct 2019 17:31:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 14:00:48 CEST jgrochowski
29. Nov 2016 11:53:34 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:31:21 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:52:39 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:29 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:26 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:00 CEST Tobias Imported from Hamamatsu datasheet.