RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013892 - Archived data from Tue, 08. March 2022 13:54:16 CET


This is all the information about APD 1305013892. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013892
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 450.6 V
Voltage for Gain 100 (T=+25°C): 422.7 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 799
Position in grid: 6
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 03. Oct 2016
Return for assembly: 23. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.8736346 V     T = -25 °C: 386.4451592 V
Voltage for Gain 150: T = +20 °C: 431.657475 V     T = -25 °C: 394.4088715 V
Voltage for Gain 200: T = +20 °C: 436.0519914 V     T = -25 °C: 398.9272957 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453518917 V-1     T = -25 °C: 4.381499118 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 7.572314284 V-1     T = -25 °C: 8.568515269 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 17.24548509 V-1     T = -25 °C: 16.20839353 V-1
Break-through voltage: T = +20 °C: 439.8561431 V     T = -25 °C: 414.5565748 V
   
Notes:


Version history

Time Author Change comment
28. Jul 2022 13:17:49 CEST oafedulidis Updated box and position via API.
28. Jul 2022 13:15:12 CEST oafedulidis Updated APD location via API.
08. Mar 2022 14:29:53 CET oafedulidis Updated APD characteristics via API.
08. Mar 2022 13:54:16 CET oafedulidis Updated APD batch assignment via API.
28. Feb 2022 15:57:50 CET oafedulidis Updated APD batch assignment via API.
24. Feb 2022 08:35:51 CET oafedulidis Updated APD location via API.
24. Feb 2022 08:35:30 CET oafedulidis Updated APD batch assignment via API.
05. Feb 2021 11:25:37 CET jreher Updated box and position via API.
07. Oct 2020 15:44:50 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:33 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:41 CET jreher Updated APD location via API.
25. Nov 2019 17:31:25 CET jreher Updated box and position via API.
22. Oct 2019 14:31:16 CEST spankonin Updated APD location via API.
14. Oct 2019 17:31:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 13:59:37 CEST jgrochowski
29. Nov 2016 11:50:58 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:32:15 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:29:51 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:51:45 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:44 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:26 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:00 CEST Tobias Imported from Hamamatsu datasheet.