RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013885


This is all the information about APD 1305013885. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013885
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen (mounted in Slice)
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 439.3 V
Voltage for Gain 100 (T=+25°C): 412.7 V
Dark current: 8.94 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 302
Position in grid: 14
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
17. Apr 2021 01:09:39 CEST jreher Updated APD location via API.
29. Nov 2016 11:52:15 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:32:08 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:29:43 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:50:19 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:59 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:26 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:00 CEST Tobias Imported from Hamamatsu datasheet.